As the last of the roof shingles were nailed into place and the last window was shimmed, many of the other subcontractors made their way into the building.
We have the sprinkler system being installed, electric wires being pulled into place, and plumbing beginning to take shape. The security and telephone wires are also weaving their way through the maze of 2 x 4s. The warmer weather is even allowing the site crew to continue their work on sub drains behind the building as well as the infiltration system. The weather is cooperating!